Quality & ComplianceModule 092 apps
Certify what was received and what was made Coming by Holi
Quality inspection used to live buried as one step inside Manufacturing; it stands on its own here because a rejection at goods-receipt and a rejection on the production floor are the same discipline, and because the certificates a business holds — the proof it follows a standard — belong next to the inspections that back them up, not scattered across email.
Reads fromPurchaseManufacturing
Writes toPurchaseManufacturingInventory & Catalog
Part of Operations & Supply
| Lot | Characteristic | Result | State |
|---|---|---|---|
| 8841 | Bore Ø12.00 +0.02 | 12.014 mm | Pass |
| 8841 | Surface finish Ra 1.6 | Ra 1.4 | Pass |
| 8839 | Hardness 45 HRC ±2 | 41 HRC | Fail · rework |
| 8837 | Thread M6×1.0 gauge | Go / No-go | Pass |
2 apps in Quality & Compliance
Quality Control
Accept, reject or rework — on goods received and on goods made — with reasons that feed the supplier scorecard and the performance flags alike.
Certificate & Compliance Register
Every standard the business or a vendor holds — a safety, labour or environmental certification — with its issue date, its expiry, and the audit that backs it, so a certificate about to lapse is visible before a buyer asks for it and finds it already expired. What this register tracks is what a sustainability report downstream is actually built from.